Construction of clear water transmission mains and partial distribution pipe network from newly built water treatment plant outside the Khulna city urban area to 7 reservoirs in the city
Construction of Khulna city domestic water distribution pipe network, total length of pipeline is 638.5km, of which 71.4 km of ductile iron pipes (diameter DN300mm to DN700mm) and
Construction of raw water intake facility with capacity of 110,000 tons per day (including pump station and supporting facilities); construction of DN1400 raw water transmission